I just assumed it was a code violation to use the ser cable in underground conduit but coudn t find the code reference that prohibits this.
Ser cable in conduit underground.
Sep 2001 total posts.
The copper wire serving is the neutral.
Posted september 08 2001 at 12 26 am can anyone find a reference in the code that prohibits se or ser cable from being installed in underground.
I m feeding a sub panel and the run will take it outside then back in again.
Csa hvteck armoured cables.
For a 6 in deep trench use galvanized rigid metal electrical conduit with individual conductors inside.
If you re using electrical metal tubing emt conduit you ll see that the closest size that you need is a 1 in conduit which gives you a 39 fill.
Hi score duplex underground service entrance.
Ordering strong brand names.
Sim pull cable in conduit.
Ser cable installed in conduit.
Csa hvtc tray cables.
Estimator project manager in trade since.
Conduit run is less than ten feet with a lb on each end.
You have to size the conduit based on the external fattest dimension of the cable.
This cable is primarily used as a panel feeder in multiple unit dwellings.
2 2 2 4 al ser the southwire company 500 ft.
You can run ser in as much conduit as you want just not underground.
2 2 2 4 al ser service entry electrical cable can be used in wet and dry locations up to 90 c or 194 f.
Conduit cable fill chart this chart for conduit size for cable is based on the 2017 nec and uses common conduit types and wires.
The product meets the useb 90 cable requirements of csa.
Find the type of conduit that you want to use in table 4.
Useb90 useb 90 underground service entrance cable consists of two compact aluminum conductors individually insulated with rw90 xlpe insulation laid in parallel with a helical plain copper wire serving and an overall pvc jacket covering.
I prefer not to pull cable with an outer covering in any conduit.
Laying uf underground feeder cable directly into the ground.
4 4 4 6 ser 82 od.
Underground cable for running electrical power to a remote location can be installed at different depths depending on the type of conduit and type of wire used.
This is known as direct burial and if you do this the uf cable must be at least 24 inches below the surface of the ground to minimize the chance of the cable being pierced by routine shoveling.
For use in almost all applications where type se cable is allowed.
I haven t run se cable so i have a question.
I was just wanting to know if using the ser cable in this manner would be a code violation.
In over 30 years i ve never used the stuff.
Also is se run inside through the floor joists.
The southwire company 500 ft.